Need pricing or product information? Click "Add to Inquiry" on any product page and send your request directly to our sales team. Learn more.

Loipart Smart Selection: Products that Deliver Environmental, Social, and Economic Benefits.
Efficient Dosing System 6 Pumps

Efficient Dosing System 6 Pumps

Article no: 988916905Model no: EDS6
The Efficient Dosing System (EDS) ensures precise and reliable detergent dosing for optimal cleaning results and reduced chemical consumption.

By default, the EDS is delivered without pre-programming, as the correct settings depend on the specific detergent being used. Programming and calibration are usually carried out on-site to ensure full compatibility and maximum efficiency.

The EDS can be pre-programmed at our warehouse before shipment, provided we receive sufficient information from the designated supplier about the detergent to be used in the machines.
  • Compatible with Electrolux Professional washer extractors equipped with Compass Control®, Compass Pro®, or Clarus Control®
  • Integrated USB port to collect statistics and monitor easily the savings
  • PC software to prepare the formulas and upload to the controller via a USB memory
  • 350 ml squeeze tube for a fast dosing of detergent
  • Available in 2, 3, 4, 5, or 6 pump versions to match any application
Contact sales
Voltage
230V 1Ph ~50/60Hz
Dimensions
550 x 500 x 80
Technical Product Specifications
Dimensions & weight
Width, net (mm)
550
Depth, net (mm)
500
Height, net (mm)
80
Weight, net (kg)
4
Weight, gross (kg)
5
Volume, net (m3)
0.22
Volume, gross (m3)
0.29
Electric
Voltage (V)
230
Phase
1
Has neutral
No
Frequency (Hz)
50, 60
General data
Country of origin
Germany
Variant Model Number
EDS6
Documents

Any questions so far? We are here for you

Our sales team are specialists and are waiting for you.

News and articles from the Loipart Group

How to Submit a Quick Inquiry
Browse our products, add the items you are interested in, and submit your inquiry in just a few steps. Simply provide your contact details and voltage requirements, and our sales team will receive your request immediately and respond as quickly as possible.
Harmony of the seas
The extensive conversion project on Harmony of the Seas, originally delivered in France in 2016, was successfully completed by LMG Finland in Cádiz, Spain, in May 2026.
5 Tips for Better Workflow Onboard