Need pricing or product information? Click "Add to Inquiry" on any product page and send your request directly to our sales team. Learn more.

Conveyor, Long Rollers With End Plate, 1600 mm

Conveyor, Long Rollers With End Plate, 1600 mm

Article no: 865197MModel no: HSLRCEP16
The table is suitable for both rack-type and hood-type dishwashers. The rack-type dishwasher can be connected directly to the table, while there are optional accessories to adapt the table with hood type dishwasher.

The table can be used on loading and/or unloading sides as the first or the last table in the
working flow. Racks are moved manually on long rollers. The rollers are easy to remove for cleaning.

The conveyor is easy to assemble with keyholes and a "snap-on" system that reduces the number of screws needed. The model is made of 304 AISI stainless steel and has a basin with a sloping bottom, drain, and endplate. I have short plastic rollers and 40x40mm square legs with height-adjustable marine feet. It is designed for 500x500 mm dishwashing baskets.
  • Easy to assemble
  • Manual rack movement with long rollers
  • Drain can be turned 360°
  • Designed to transport 500x500 mm baskets
Contact sales
Dimensions
1645 x 620 x 910
Technical Product Specifications
Certifications & regulations
Certifications
CE
Dimensions & weight
Width, net (mm)
1645
Depth, net (mm)
620
Height, net (mm)
910
Weight, net (kg)
23
Weight, gross (kg)
45
Volume, net (m3)
0.93
Volume, gross (m3)
1.21
Electric
Has neutral
No
General data
Country of origin
Sweden
Variant Model Number
HSLRCEP16
Documents

Any questions so far? We are here for you

Our sales team are specialists and are waiting for you.

News and articles from the Loipart Group

How to Submit a Quick Inquiry
Browse our products, add the items you are interested in, and submit your inquiry in just a few steps. Simply provide your contact details and voltage requirements, and our sales team will receive your request immediately and respond as quickly as possible.
Harmony of the seas
The extensive conversion project on Harmony of the Seas, originally delivered in France in 2016, was successfully completed by LMG Finland in Cádiz, Spain, in May 2026.
5 Tips for Better Workflow Onboard