Need pricing or product information? Click "Add to Inquiry" on any product page and send your request directly to our sales team. Learn more.

Modular Shelving System, Upright, Depth 600 mm, S/S

Modular Shelving System, Upright, Depth 600 mm, S/S

Article no: 168598Model no: 168598
The upright module is the base of a modular shelving system, intended for hygienic storing on board. The system is easy to assemble and made of high-quality stainless steel and come with height adjustable footplate kits for easy mounting.


The shelves are of a louvred type and can be height adjusted in steps of 160 mm. Different lengths are available as well as matching side and end guard rails to secure the stored food. A crossbar can also be used to reinforce the sections.
  • S/S
  • Uprights are the base of a modular shelving system
  • Marine footplate kit included
Contact sales
Dimensions
600 x 25 x 1800
Technical Product Specifications
Dimensions & weight
Width, net (mm)
600
Depth, net (mm)
25
Height, net (mm)
1800
Weight, net (kg)
4.9
Weight, gross (kg)
6
Volume, net (m3)
0.03
Volume, gross (m3)
0.04
Electric
Has neutral
No
General data
Country of origin
Norway
Variant Model Number
168598
Included in delivery description
2 pcs marine feet (Plate Kit).
Documents
Accessories
Cross Bar 1200 mm, S/S

Cross Bar 1200 mm, S/S

S4120
Accessory
Cross Bar 700 mm, S/S

Cross Bar 700 mm, S/S

S4070
Accessory
Cross Bar 600 mm, S/S

Cross Bar 600 mm, S/S

S4060
Accessory
End Guard Rail L=600 mm, S/S

End Guard Rail L=600 mm, S/S

SE550060
Accessory
Shelf, Louvered, 700X600 mm, S/S

Shelf, Louvered, 700X600 mm, S/S

168576
Accessory

Any questions so far? We are here for you

Our sales team are specialists and are waiting for you.

News and articles from the Loipart Group

How to Submit a Quick Inquiry
Browse our products, add the items you are interested in, and submit your inquiry in just a few steps. Simply provide your contact details and voltage requirements, and our sales team will receive your request immediately and respond as quickly as possible.
Harmony of the seas
The extensive conversion project on Harmony of the Seas, originally delivered in France in 2016, was successfully completed by LMG Finland in Cádiz, Spain, in May 2026.
5 Tips for Better Workflow Onboard