Offshore Structures: CLOV FPSO Project

CLOV FPSO PROJECT

The French oil & gas giant “Total” is the major share operator of the CLOV project which is an integrated development of a four-field cluster on the northwest sector of Angola's offshore Block 17. Drilling will begin in 2012 and the first oil recovery is expected in 2014.

 

Located approximately 140 kilometres from Luanda and 40 kilometres northwest of Dalia in water depths ranging from 1,100 to 1,400 metres, the CLOV development will lead to the four fields - Cravo, Lirio, Orquidea and Violeta – coming on stream. The proved and probable reserves are estimated at approximately 500 million barrels of oil. A total of 34 subsea wells will be tied back to the CLOV Floating Production, Storage and Offloading (FPSO) unit, which will have a processing capacity of 160,000 barrels of oil per day and a storage capacity of approximately 1.8 million barrels.

CLOV will accommodate 240 POB and was built by Daewoo Shipbuilding & Marine Engineering Co (DSME), Korea as H6049.

Loipart´s commitment

Loipart has supplied all galley appliances and laundry machines in order to facilitate high standard catering for those 240 persons onboard. Among the equipment supplied are dynamic preparation machines, refrigerated machines such as freezers, refrigerated cabinets, showcases,  soft ice cream machines, beverage systems and waste handling solutions. As for the cooking systems there are 20-grid multifunctional combi ovens and also horizontal cooking appliances such as ranges, bratt pans and fryers. By utilizing the Loipart team’s competence and complete range of products DSME has been able to supply the FPSO according to top standard and CLOV will be well prepared for many years to come.

Read more

Please read more about CLOV FPSO Project

More information?

For more info about our references, and what we can do for you, please contact Teea Lehtinen.