Offshore Structures: West Oberon

West Oberon

The two Drilling Rigs (JU2000E-9 & 10) ordered by Seadrill at Dalian Shipbuilding International Co. China, represent the latest generation of high specification Jack-Up Drilling Rigs with greater capacities and capabilities than current more conventional units.

 

The units, where West Oberon is the first of the two rigs are based on the Friede & Goldman JU2000E design and are suitable for operations worldwide, including the southern North Sea. Delivery of the rigs is scheduled to 2012 and 2013 respectively. 

One of the few

As the electrical system on board is 480 Volt on 3 phases, Loipart is one of the few companies in the world being able to make a complete delivery with machines specially adapted for such systems.

Some say we strive for perfectionism − however we believe in supplying the correct products for the right environment.

Loipart´s commitment

Loipart supplied all machines for catering purposes in galley, pantry and laundry areas and by that they are well suited to serve those 140 men and women on board.

Read more

Please read more about the two drilling rigs 

More information?

For more info about our references, and what we can do for you, please contact Teea Lehtinen.